Work Party October 29,2006

The weather is changing, and today was a good example of what is to come.  Very windy, colder, with some rain.  This kept the numbers down of those attending, but some good work was done.  The plan was to get the spars under cover and an Ash log sawn up for material to make the Mast hoops and a pine log run through the Mill to create the Top Mast for La Revenante. Those attending today were Dr. John Wootten, Suzanne Wootten, Vern and Linda Fairhead and Harry Foster.

Click on a thumbnail image to see and learn more
John Wooten directs placement of the mNow that is a big tarp The tarp safely on.
Vern setting up to Mill two logs.
Vern on the Mill and John Wootton on the clutch.
Vern milling the Ash log Showing the tapered spar